Day | Works/Activities | Material | Action | ||
Types | Rate | ||||
-25 | Clean and repair the front, drain, rope and water control doors. | Ground Magnesium Limestone (GML) | pH | tan/ha | Clean all drains and drains thoroughly |
5,0-5.49 | 1.5 | ||||
4.5-4.99 | 3.0 | ||||
5.0 | |||||
Sprinkle lime if necessary | * If pH <5.5 GML lime solution is required. * GML should be ground into soil during first plowing. | ||||
-20 | Plow 1 | * Use 4-wheel tractor and rotor tools. * Make sure the whole area is hijacked properly. * Restrict the use of large tractors to dry field conditions only. | |||
Increase soil CEC (cation exchange rate) | Baja organan | Follow the label instructions | * Sprinkle with hundreds of episodes each season | ||
-18 | Lose a rat | Recommended rat poison - Appendix i & ii | Follow the label instructions | * Follow the level command * Repeat solicitation until the number of feeds consumed decreases below 20% | |
Putting water into a field | * Adjust the JPS water supply schedule. * Control water level with control box. |